Production Process of the 12m Movable Wall
- Each panel was precision-manufactured in our facility with aluminum alloy frames and high-density acoustic insulation cores, ensuring soundproof performance up to 53 dB for the multi-purpose hall environment.
- Surface finishing included powder-coated panels in a neutral tone specified by the client, matched to the government building's interior palette for a seamless visual integration.
- Top-hung track components and retractable sealing mechanisms were factory-tested before shipment to guarantee smooth operation at the full 12-meter height on-site.
Installation Team Deployment in Bahrain
- Our dedicated installation crew mobilized to the Bahrain government building site with all prefabricated panels, steel sub-frames, and overhead track hardware shipped in a single consolidated container.
- The team completed structural reinforcement of the ceiling slab to bear the load of the 12-meter-tall panels, followed by precision alignment of the dual-track hanging system across the full hall width.
- On-site commissioning included repeated open-close cycle tests, acoustic seal engagement checks, and operator training for the client's facility management staff.
Application in the Government Multi-purpose Hall
- The movable wall divides the large multi-purpose hall into two or more independent rooms, enabling simultaneous government meetings, community events, and ceremonial functions without acoustic interference.
- Fire-rated materials and compliance with Bahrain civil defense standards were integrated into every panel, meeting the stringent safety requirements of public-sector venues.
- The 12-meter clear height accommodates the hall's full floor-to-ceiling dimension, eliminating the need for secondary infill panels and delivering a clean, uninterrupted partition line.