How to Operate a Movable Partition Wall: Deployment and RetractionThis guide describes the day-to-day operation of a manually operated top-hung operable partition: moving panels out of storage, setting the seals, and returning the run to its parking position.Scope of this guide. NEUWALL systems are top-hung — the finished floor has no track or guide. NW831 and NW840 are manual systems only and are operated with the supplied operating lever. Semi-automatic and fully automatic operation applies to NW840-W only.Setting up a partition (deployment)1. Positioning the panelsStand centred on the panel face. Grasp the panel by both edges, as high as is comfortable, and draw it gently towards you.Manoeuvre the panel out of the storage area without striking adjacent panels or the ceiling finish.Move the panel along the overhead track to its position in the run.Push it firmly against the adjacent wall or panel so the vertical joint closes.2. Engaging the acoustic sealsLocate the operating lever on the vertical edge of the panel.Grasp the lever firmly and press it down in one smooth motion through approximately 90 degrees.This compresses the top seal against the track and extends the bottom seal to the finished floor.Repeat for the remaining panels, working in sequence along the run.3. Closing the runMove the final closure panel into position.Operate its lever to expand the jamb and complete the acoustic seal against the fixed wall.Check that all levers are down and that no vertical joint is open.Stacking and storing the partitions (retraction)Warning: do not move any panel while its seals are still engaged.Start at the closure panel. Lift the lever upwards out of its locked position.Once the lever is back in the vertical (up) position, the seals are fully retracted.Repeat for every panel in the bank before moving anything.With all levers vertical and all seals retracted, gently push the panels back towards the storage position.When to stop and call for supportA panel will not travel, or a carrier repeatedly sticks at an intersection.A lever does not lock, or a seal does not retract fully.Panels no longer align, or a visible gap remains in a vertical joint.Contact NEUWALL: Email: jerry@neuwall.com · Phone / WhatsApp: +86 15901822516.