Operable Partitions for Conference & Meeting Rooms

The hard part of a meeting-room split is rarely the wall. It is the ceiling void: the track needs a clear, straight run and a support above it, and the finished ceiling still has to look like one continuous plane.

Buyers ask: "How do I split one conference room into two usable rooms?"

The specification problem

Two rooms are only useful if they are private. State the acoustic target and the test standard in the specification rather than asking for "soundproof" — those are different conversations.

AV, projection, whiteboards and door swings all compete for the same wall. Decide them together, because the pass door position and any writing surface are fixed when the panels are made.

These are selection notes, not a new product line. The panels, models and published data are on the product pages. No acoustic or fire figure is published here, and no model is compared against another on an application page.

What to specify

The items below are the ones that decide whether the wall works. Fix them before the shop drawing is issued.

01

Ceiling void

Available depth above the finished ceiling, the position of the supporting beam or slab, and any services running along the track line.

02

Track access

A route to inspect and adjust the hangers after handover. The track is above the ceiling; plan an access panel rather than burying it.

03

Privacy target

State the project target and the test standard. Published acoustic figures belong to a tested build and are quoted on the product pages and in the STC Acoustic Guide.

04

Face and function

Whiteboard, fabric or plain faces as the room needs. Finish options are in the colour cards under Downloads.

05

Pass door

A separate leaf lets people leave either room without opening the wall. Fix its side and swing on the shop drawing.

Configuration & model selection

Standard-height meeting rooms commonly use single-panel or paired-hinged configurations, with a pass door where both rooms need independent access. See Single Panel and Folding.

Model selection (NW831 / NW840 / NW840-W) follows the height, the finish and the seal mode. The comparison matrix is on How to Choose.

Send the reflected ceiling plan and the room layout. We will return a shop drawing showing the track zone, the access panel position and the pass door arrangement.

Operating modes are model-bound. NW831 and NW840 are manual only. Semi-automatic and fully automatic seal operation is available on the steel-framed NW840-W only, and needs the drive and control interfaces drawn into the wall at order stage.

Data for this room

A room type does not carry performance values. Cells marked — are established from the project, not guessed here.

ItemValueHow it is established
Opening width—Confirm at finished floor and track level.
Finished panel height—Confirm against the finished ceiling.
Ceiling void depth—From the reflected ceiling and section drawings.
Access to track—Access panel position to be shown on the RCP.
Acoustic target—State the project target and the test standard.
Fire classification—Quote the standard actually tested.
Why most cells read —. A room type does not have a fixed acoustic, fire or load value: those figures belong to a tested panel build and a tested assembly, not to a room. We do not convert Rw (ISO 717-1) into STC (ASTM E413 / E90), we do not average or derive one from the other, and we do not treat one fire classification as equivalent to another. Send the opening and the project's stated target; we will confirm what can actually be published for that build, against the standard that was tested.

Frequently asked questions

▸How much ceiling void does the track need?
It depends on the track and hanger assembly chosen for the panel height. We do not publish a single figure for a room type. Send the ceiling section and we will return the required track zone on the shop drawing.
▸Can the track be inspected after handover?
Yes, if an access route is designed in. Hanger adjustment and seal compression are routine maintenance items, so plan an access panel along the track line rather than burying the track behind a continuous ceiling. The Maintenance Manual sets out the checks.
▸Can one face be a whiteboard?
Whiteboard and fabric faces are among the options discussed on the product pages. Tell us which face you need at enquiry stage — the panel build and the pass door layout are fixed at order stage.
▸Do both rooms need their own door?
If each room must be usable independently, plan a pass door in the wall or a separate room door on each side of the closed position. The pass door position and swing are fixed on the shop drawing; see the Passdoor Drawings.

Need a shop drawing for your opening?

Send the opening dimensions, the finished ceiling build-up and your subdivision plan. We will confirm the panel schedule, hanger points and stacking geometry, and tell you which model we would quote.